首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Variability propagation in the production planning and control mechanism of construction projects
Authors:Omar Zegarra  Luis F Alarcón
Institution:Department of Construction Engineering and Management, School of Engineering, Pontificia Universidad Católica de Chile, Santiago, Chile
Abstract:One explanation for the often-problematic performance of projects is poor execution of the production planning and control function. This function’s supply, an arrangement of managerial processes, plays a key role in driving a project’s construction operations and the variability propagation across them. However, the variability propagation across the function’s supply structure has not been considered. This research addresses this gap by exploring the behaviour of outcomes over the function’s supply. To do so, this paper studies the existence of variability propagation in the function supply during the construction stage of five infrastructure projects that used the Last Planner® System as a tool. A plausible propagation pattern was found. The pattern expresses the complex behaviour of the function’s supply. Further work is required to address the impact of the pattern on the performance of the function supply and the pattern’s implications for improving the function supply.
Keywords:Lean management  last planner  language action perspective  bullwhip effect  complex adaptive systems
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号