炼钢3~#转炉煤气回收工程的组织及进度控制
引用本文:李智,孟俊婷.炼钢3~#转炉煤气回收工程的组织及进度控制[J].阴山学刊,2000(6).
作者姓名:李智  孟俊婷
作者单位:包钢建设部!内蒙古包头014010(李智),包头钢铁学院经济管理系!内蒙古包头014010(孟俊婷)
摘    要:论述了工程组织的难点,工程各项目实施阶段的控制。这些控制包括:设计前准备阶段进度控制,设计阶段进度控制,编制施工总进度计划,施工阶段工程进度控制。

关 键 词:工程组织  进度控制  煤气回收工程

Organizing and Controlling Construction Project of Recovering Coal Gas of 3th Steel-making Convert
LI Zhi, MENG Jun-ting.Organizing and Controlling Construction Project of Recovering Coal Gas of 3th Steel-making Convert[J].Yin Shan Academic Journal,2000(6).
Authors:LI Zhi  MENG Jun-ting
Abstract:Difficult point of organizing construction project and controlling construction stage are discussed. These are the controlling preparation schedule after construction design, the controlling design stage schedule, the editing total construction schedule I controlling constructing sage.
Keywords:organizing construction  construction schedule  construction project of recovering coal gas