首页 | 本学科首页   官方微博 | 高级检索  
     检索      

MRPⅡ和独立有限调度的分析比较
引用本文:贾佩山.MRPⅡ和独立有限调度的分析比较[J].中国管理科学,1997,5(2):14-21.
作者姓名:贾佩山
作者单位:上海交通大学计算机系, 200030
摘    要:MRPⅡ是当今制造业普遍采用的计算机辅助管理模式,但MRPⅡ的能力调度有一定的缺陷.本文论述了能力调度的新方法──独立有限调度,并通过图表模型详细分析这两种调度方法的异同.

关 键 词:制造业资源计划  有限能力计划  独立有限调度  粗能力计划  能力需求计划  需求流模型  
收稿时间:1996-11-25;

The Differences Between MRP Ⅱ and Stand-alone Finite Schedulers
Jia Peishan.The Differences Between MRP Ⅱ and Stand-alone Finite Schedulers[J].Chinese Journal of Management Science,1997,5(2):14-21.
Authors:Jia Peishan
Institution:Dept. of Computer Seience, Shanghai Jiaotong University, 200030
Abstract:The relationship between finite schedulers which operate on output from a higher level in aconventional MRP Ⅱ system and so-called stand-alone schedulers which essentially operate directly onorders is discussed. Two graphical models-a demand flow model and a flowpipe model-are presented.The growth of the stand-alone scheduler is ascribed to the greatly increased computing power availablequite inexpensively on modern equipment.
Keywords:MRPⅡ  FMS  Stand-alone finite schedulers  CRP  RCCP  Demand flow model  
本文献已被 维普 等数据库收录!
点击此处可从《中国管理科学》浏览原始摘要信息
点击此处可从《中国管理科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号