首页 | 本学科首页   官方微博 | 高级检索  
     


Editorial
Authors:Stephen J. Childe
Affiliation:1. Department of Management , University of Ulsan , Republic of Korea ckparkuou@ulsan.ac.kr;3. Department of Industrial Engineering , University of Ulsan , Republic of Korea;4. Department of Production Engineering Development , Hyundai Heavy Industries , South Korea;5. Industrial Research Institute, Hyundai Heavy Industries , South Korea
Abstract:As the largest shipbuilding company in the world and the leader in the Korean merchant shipbuilding industry, Hyundai Heavy Industries is currently struggling to carry out intensive productivity improvements. These are needed in order to be the global merchant shipbuilding market leader by surpassing the competition from Japan and the threat from China armed with very cheap labour costs. This paper introduces the academy and industry collaborative project, part of the productivity improvement efforts conducted on the steel stockyard operations. As a pilot project it researched a way of improving the stockyard operations and future projects on the stockyard operations. The project defined the stockyard operations, measured current situations, and analysed operational difficulties. In addition, the project developed the steel stockyard operations simulator. Besides the simulator used by the operations manager, who has relied heavily on his work-experienced intuition when making decisions, this paper expects that further projects on the stockyard operations utilise the simulator for their own purposes.
Keywords:Steel stockyard  Shipbuilding  Computer simulation
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号