Abstract: | This paper presents a genetic algorithm for a single machine-scheduling problem with the objective of minimizing total tardiness. Each job has its own due date and the set-up times are sequence dependent. The parameters of the genetic algorithm are determined by a statistical method. For small problems, the solutions given by the proposed method are compared with solutions provided by a commercial package, and for larger problems, with those obtained by a heuristic proposed in the literature. |