首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Optimal maintenance intervals for a multi-component system
Authors:A S B Tam  J W H Price
Institution:Department of Mechanical Engineering , Cooperative Research Centre for Integrated Engineering Asset Management (CIEAM), Monash University , Building 31, Clayton Campus, Wellington Road, Clayton, VIC 3800, Australia
Abstract:In the manufacturing industry, preventive maintenance (PM) is carried out to minimise the probability of plant unexpected breakdown. Planned PM is preferred as disruption to operation is then minimised. Suggested PM intervals are normally prepared by the original equipment manufacturers (OEMs), however due to the multifaceted relationship between operating context and production requirement for different plants, it is unlikely that these suggested intervals as prescribed by the OEMs are optimal. Reliability, budget and breakdown outages cost are some of the critical factors that will affect the calculation of optimal maintenance intervals. Maintenance managers are required to determine optimal maintenance intervals with the above different requirements set by management. In this paper three models are proposed to calculate optimal maintenance intervals for multi-component system in a factory subjected to minimum required reliability, maximum allowable budget and minimum total cost. Numerical examples are provided to illustrate the application and usefulness of the proposed models.
Keywords:Preventive maintenance interval  Multi-component system  Reliability  Budget  Breakdown outages cost
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号