首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Experimental earliness/tardiness production planning with the due window system
Authors:Wei Wang  Dingwei Wang  Tian-Ling Ren
Abstract:

In order to use the philosophy of JIT to improve the production planning method of MRP-II, we propose the experimental software system of the earliness/tardiness produc tion planning problem with due window. By means of the approaches and model reported in this paper, the optimal production planning can be achieved. The recommended model extends the problem of due window from the shop scheduling level into the aggregated planning level of mass manufacturing systems. Simulation results have demonstrated that the experimental software is a useful tool for the production management of repetitive manufacturing enterprises.
Keywords:Manufacturing Resource Planning  Mrp-ii  Just-in-time  Due Window  Production Planning  Repetitive  Production Environment
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号