首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Genetic algorithm to production planning and scheduling problems for manufacturing systems
Authors:K F Man  K S Tang  S Kwong  W H Ip
Institution:1. City University of Hong Kong , Tat Chee Avenue, Kowloon, Hong Kong E-mail: yli@ee.cityu.edu.hk;2. City University of Hong Kong , Tat Chee Avenue, Kowloon, Hong Kong;3. Department of Manufacturing Engineering , The Hong Kong Polytechnic University , Hung Hom, Kowloon, Hong Kong
Abstract:

Fundamental and extended multi-objective (MO) models are designed to address earliness/tardiness production scheduling planning (ETPSP) problems with multi-process capacity balance, multi-product production and lot-size consideration. A canonical genetic algorithm (GA) approach and a prospective multi-objective GA (MOGA) approach are proposed as solutions for different practical problems. Simulation results as well as comparisons with other techniques demonstrate the effectiveness of the MOGA approach, which is a noted improvement to any of the existing techniques, and also in practice provides a new trend of integrating manufacturing resource planning (MRPII) with just-in-time (JIT) in the production planning procedure.
Keywords:Genetic Algorithms (GA)  Multi-OBJECTIVE (MO)  Optimization Production/INVENTORY Management And Control (PIMC)  Earliness/TARDINESS Production Scheduling And Planning(ETPSP)
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号