首页 | 本学科首页   官方微博 | 高级检索  
     


Solving a process engineer's manpower-planning problem using analytic hierarchy process
Authors:Taho Yang  Rong-Shean Lee  Chunghsi Hsieh
Affiliation:1. Institute of Manufacturing Engineering , National Cheng Kung University , No. 1 University Road, Tainan, 701, Taiwan E-mail: tyang@mail.ncku.edu.tw;2. Institute of Manufacturing Engineering , National Cheng Kung University , No. 1 University Road, Tainan, 701, Taiwan E-mail: mersl@mail.ncku.edu.tw;3. Darfon Electronics Corporation , 21 Industry II Road Annan, Tainan, 709, Taiwan E-mail: hchsieh@darfon.com.tw
Abstract:

The role of a process engineer (PE) is vital in a high-technology organization. Generic manpower-planning approaches, such as regression or mathematical programming methods, are difficult to apply to PE manpower-planning problem. A simple production-volume to staffing-level ratio did not properly reflect the required PE staffing needs. This research considered both production volume and complexity to plan the required PE staffing level. Production complexity is an indicator of the amount of PE attendance time, and this is innovatively evaluated in the present study using the analytic hierarchy process (AHP). A case study is used to illustrate the proposed methodology.
Keywords:Process Engineer  Manpower Planning  Analytic Hierarchy Process  Production Complexity
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号