Resource smoothing: A cost minimization approach
Authors:Edem O P Akpan
Abstract:

From the available literature, there seems to be no defined approach to resource smoothing exercise except those attempted by Weist (1967, Management Science, 13, B359-B377) and Burgess and Killebrew (1962, Journal of Industrial Engineering, 13, 76-83). The aim of the smoothing exercise is to achieve optimal resource usage by avoiding high peaks and deep valleys in the project resource profile. The general approach has always been to move some activities with floats in the high peak regions to be started at a later date, and as this is done, the valleys will be filled to smooth the resource profile subject of course to time constraint. If this approach is followed as it is, it would be difficult to determine optimality especially when many resources are involved. A cost minimization approach is envisaged in the present study with no limitation on the number of resource inputs. In a situation where the resources are assumed to have the same value, the cost assigned to each of them should be similar. The method follows the general concept but with a difference; cost of the activity in question is considered. The exercise is continued until all the floats are exhausted. The optimum result would then be the one with the minimum cost profile. From examples used for the evaluation, the results obtained are comparable to those of the above two researchers, and some with better results in the majority of cases.
Keywords:Resource Usage  Minimum Cost  Activity Floats  Network Technique
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号