首页 | 本学科首页   官方微博 | 高级检索  
     检索      


An application of BPR and RCM methods to an oil refinery turnaround process
Authors:M Bevilacqua  F E Ciarapica  G Giacchetta  M Bertolini
Institution:1. DIEM sede di Forlì , Università di Bologna , Via Fontanelle 40, 47100 Forlì, Italy maurisio.bevilacqua@unibo.it;3. Dipartimento di Energetica , Università Politecnica delle Marche , via Brecce Bianche, Ancona, Italy;4. Dipartimento di Ingegneria Industriale , Università degli Studi di Parma , Viale delle Scienze, 181/A-43100, Parma, Italy
Abstract:This works reports on the application of business process re-engineering (BPR) methods to a specific stage in the maintenance activities of the API refinery in Falconara Marittima (AN), i.e. the scheduled annual turnaround. The aim of the study was to analyse the process as it was always implemented up until the year 2001, identifying any related problems and inconsistencies, and then describe the re-engineering of this process, assessing and emphasising the changes involved and pinpointing further opportunities for improvement. Using the synergies provided by the simultaneous adoption of management policies and maintenance management methods enables considerable changes to be made with a view to the production of servicing plans that ensure a greater reliability at the lowest possible cost. The annual turnaround process was modelled using the AIØ WIN software, which supports the IDEFØ method.
Keywords:Business process re-engineering  Maintenance  IDEFØ method  Case studies
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号