政治风险视域下国际工程项目系统的脆弱性研究
引用本文:邓小鹏,Low Sui Pheng,纪沿光.政治风险视域下国际工程项目系统的脆弱性研究[J].北京理工大学学报(社会科学版),2015,17(1):78-82.
作者姓名:邓小鹏  Low Sui Pheng  纪沿光
作者单位:东南大学 土木工程学院,南京 210096;新加坡国立大学 设计与环境学院,新加坡117566
基金项目:国家自然科学基金面上项目"国际工程中政治风险的集成度量及智能决策研究:理论、实证及应用"(71372199)
摘    要:基于项目系统脆弱性的视角,分别从能力维度(核心竞争力、相对议价能力和综合适应能力)和风险暴露维度(项目属性的暴露、企业属性的暴露和交易属性的暴露),识别并探讨影响国际工程项目系统相应于政治风险的脆弱性因素,并依据能力维度和暴露维度的高低将系统脆弱性分成4种状态,针对每种脆弱性状态的特点,给出承包商可采取的相应策略.最后选取了6个典型国际工程项目进行了实证分析.结果表明:中国的国际承包商在高政治风险区域展开国际业务时,可依据项目系统所面临政治风险时的脆弱性状态采取合适的策略以更好地管理政治风险.

关 键 词:国际工程  承包商  政治风险  脆弱性
收稿时间:2014/1/16 0:00:00

Research on Vulnerability of International Construction Project:from the View of Political Risk
DENG Xiaopeng,LOW Suipheng and JI Yanguang.Research on Vulnerability of International Construction Project:from the View of Political Risk[J].Journal of Beijing Institute of Technology(Social Sciences Edition),2015,17(1):78-82.
Authors:DENG Xiaopeng  LOW Suipheng and JI Yanguang
Institution:1.School of Civil Engineering, Southeast University, Nanjing 210096, China2.School of Design and Environment, National University of Singapore, Singapore 117566
Abstract:Based on the view of system vulnerability, the project system vulnerability to political risks is discussed from two dimensions: capacity dimension(i.e. core competitive capacity, relative bargain capacity and integrate adaptive capacity)and exposure dimension(project-based exposure, firm-based exposure and transaction-based exposure). Four typologies of project system vulnerability involving varying exposure and capacity are identified. The features and feasible countermeasures of each typology are discussed in this paper. Empirical analysis is conducted through selecting six ongoing projects. The results show that based on the status of project system vulnerability to political risks, Chinese international contractors can adopt appropriate strategies to manage political risks in those markets associated with highly political risks.
Keywords:international construction project  contractor  political risk  vulnerability