The 6th Corporation of the 20th Construction Bureau, Xianyang 712000, China
Abstract:
The hanger erection and control experience for Weihe River Bridge at Guangyuan Road in Baoji City is introduced. The length adjustment for the hanger fabrication, the erection of the hanger, the tension control for the hanger and the change of configurati