首页 | 本学科首页   官方微博 | 高级检索  
     检索      


The Value of Using Scheduling Information in Planning Material Requirements*
Authors:John J Kanet  V Sridharan
Abstract:Current research and practice in the field of production and inventory planning is dominated by hierarchical, material requirements planning-based methods. The objective of this research is to determine the merits of a major redirection for the design of manufacturing planning systems—a direction that more directly exploits the capabilities of modern computer technology. We test the relative performance of two fundamentally different classes of manufacturing planning systems: (1) those that make no use of sequencing and scheduling information in the planning of material deliveries (for example, traditional MRP-based systems), and (2) those that use sequencing and scheduling information to plan delivery of materials. We first derive an analytical expression for the expected benefit (in terms of flow time reduction) of using scheduling information for a single machine system. We then describe and test a simple heuristic for predicting the improvement that could be realized in more complicated multimachine systems, under certain conditions. Results from controlled simulation experiments, over a wide range of operating environments, suggest that although the value of scheduling information is influenced by the operating environment, it could be substantial.
Keywords:Heuristics  Job Shop Scheduling  Material Requirements Planning  Order Release  Production and Inventory Control Systems  Queuing Theory  and Simulation
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号