首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Preventive replacement policies with products update announcements
Authors:Satoshi Mizutani  Wenjie Dong  Toshio Nakagawa
Institution:1. Department of Business Administration, Aichi Institute of Technology, Toyota, Japan;2. College of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing, China
Abstract:Abstract

When we consider the improvement of the functional performances that are released by the new updates of the products, it is an interesting problem to revisit the existing replacement policies. For such a viewpoint, four replacement models with product update announcements, i.e., PUA for abbreviation, are given in this paper: Model 1, the unit is replaced at time T or at PUA over time T. Model 2, the unit is replaced at the Kth failure or at PUA over the Kth failure. By considering both time T and failure K, Models 3 and 4 are obtained based on the approaches of replacement first and last. We obtain the expected cost rates for four models and discuss analytically their optimal replacement policies Further, numerical examples are given when the time for PUA has an exponential distribution.
Keywords:Preventive maintenance  replacement last  minimal repair  random failure  product update
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号