首页 | 本学科首页   官方微博 | 高级检索  
     


The computation of average run length and average time to signal: an overview
Abstract:Control charts are widely used in industries to monitor a process for quality improvement. Evaluation of the average run length (ARL) or average time to signal (ATS) plays an important role in the design of control charts and performance comparison. In this paper, we review several basic and popular procedures, including the Markov chain and integral equation methods for computing ARL, ATS and associated run length distributions for cumulative sum charts, exponentially weighted moving average charts and combined control charts, respectively. Some important references and key formulations are provided for practitioners.
Keywords:average run length  average time to signal  Markov chain  integral equation  statistical process control
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号