首页 | 本学科首页   官方微博 | 高级检索  
     


Procedures and tables for the construction and selection of chain sampling plans ChSP-4A(c1, c2,)r-Part 4
Authors:C. Raju   M. N. Narasimha Murthy
Affiliation: a Department of Studies in Statistics, University of Mysore, Indiab Examination Reform Unit, University of Mysore, India
Abstract:In this part of the series, the notion of average total inspection (ATI) is introduced to ChSP-4A(c1, c2)r plans, minimizing ATI at a given process average, while protection to the consumer is given in terms of average outgoing quality limit and limiting quality level. The procedure is similar to that of Dodge and Roming.
Keywords:
本文献已被 InformaWorld 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号