On the run length of a Shewhart chart for correlated data |
| |
Authors: | W Schmid |
| |
Institution: | 1. Abteilung Stochastik, Universit?t Ulm, D-89069, Ulm
|
| |
Abstract: | We consider an extension of the classical Shewhart control chart to correlated data which was introduced by Vasilopoulos/Stamboulis (1978). Inequalities for the moments of the run length are given under weak conditions. It is proved analytically that the average run length (ARL) in the in-control state of the correlated process is larger than that in the case of independent variables. The exact ARL is calculated for exchangeable normal variables and autoregressive processes (AR). Moreover, we compare this chart with residual charts. Especially, in the case of an AR(1)—process with positive coefficient, it turns out that the out-of-control ARL of the modified Shewhart chart is smaller than that of the Shewhart chart for the residuals. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |
|