首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Tour Scheduling and Task Assignment of a Heterogeneous Work Force: A Heuristic Approach
Authors:John S Loucks  F Robert Jacobs
Abstract:The dual problem of work tour scheduling and task assignment involving workers who differ in their times of availability and task qualifications is examined in this paper. The problem is presented in the context of a fast food restaurant, but applies equally well to a diverse set of service operations. Developing a week-long labor schedule is a nontrivial problem, in terms of complexity and importance, which a manager spends as much as a full workday solving. The primary scheduling objective (the manager's concern) is the minimization of overstaffing in the face of significant hourly and daily fluctuations in minimum staffing requirements. The secondary objective (the workers’ concern) is the minimization of the sum of the squared differences between the number of work hours scheduled and the number targeted for each employee. Contributing to scheduling complexity are constraints on the structure of work tours, including minimum and maximum shift lengths and a maximum number of workdays. A goal programming formulation of a representative problem is shown to be too large, for all practical purposes, to be solved optimally. Existing heuristic procedures related to this research possess inherent limitations which render them inadequate for our purposes. Subsequently, we propose and demonstrate a computerized heuristic procedure capable of producing a labor schedule requiring at most minor refinement by a manager.
Keywords:Heuristics  Mathematical Programming  Scheduling  and Service Operations Management
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号