首页 | 本学科首页   官方微博 | 高级检索  
     检索      

淤泥质粘土层深基坑SMW围护桩施工控制
引用本文:宫元生,赵炜.淤泥质粘土层深基坑SMW围护桩施工控制[J].石家庄铁道学院学报(社会科学版),2006(3):121-124.
作者姓名:宫元生  赵炜
作者单位:[1]中铁十五局集团第五工程有限公司,河南洛阳471002 [2]中铁隧道股份有限公司,河南新乡453000
摘    要:西湖隧道在淤泥质粘土层深基坑中,采用SMW围护桩,经监测能够达到设计要求,其施工工艺和控制措施为淤泥质粘土地区深基坑的施工提供类似施工经验。

关 键 词:深基坑  淤泥质粘土  SMW围护桩  施工控制
修稿时间:2006/4/20 0:00:00

SMW Support Pile Construction Control for Deep Foundation Pit in Silty Clay
Authors:Gong Yuansheng  Zhao Wei
Institution:1. The 5th Engineering Company of the 15th China Railway Bureau Group, Luoyang 471002, 2. China Railway Tunnel Company, Ltd. , Xinxiang 453000, China
Abstract:Xihu Tunnel is located at deep foundation pit in silty clay. In the construction, SMW support piles were adopted and proved to be up to design requirement through control observation. The construction technology and control measures may provide reference
Keywords:deep foundation pit  silty clay  SMW support pile  construction control
点击此处可从《石家庄铁道学院学报(社会科学版)》浏览原始摘要信息
点击此处可从《石家庄铁道学院学报(社会科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号