School of Civil Engineering, Shijiazhuang Railway Institute, Shijiazhuang 050043, China
Abstract:
This paper adopts three-dimensional numerical method analyzing the construction process of tunnel opening of the metro segment from Gongti North Road to Hujialou. The analysis considers two situations respectively-construction with and without pre - suppo