Abstract: | The early/tardy problem is one of the most vexing pieces of the complex production scheduling decision process. So far most of the research has been on single-machine environments. Hence, we considered the weighted early/tardy scheduling problem in a simulated dynamic multimachine job shop. We analyzed controlled job-release and dispatch rules using time and cost information at a variety of stationary and nonstationary utilization rates, due-date allowances, and early/tardy cost levels. We found a newly developed method for controlling the release for all job operations using early/tardy cost information, superior to other release mechanisms overall in both our stationary and nonstationary analyses. We found immediate release useful at many high utilization conditions and a gateway-only release method best in many low utilization conditions. A modified version of a single-machine early/tardy dispatch method was clearly superior to the dispatch rules for almost all the simulated shop conditions. |