首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Resolution of the Long-Term Performance Issues at the Waste Isolation Pilot Plant
Authors:Matthew K Silva  Dale F Rucker  Lokesh Chaturvedi
Institution:(1) Environmental Evaluation Group, 7007 Wyoming Boulevard NE, Suite F-2, Albuquerque, New Mexico, 87109
Abstract:The Waste Isolation Pilot Plant (WIPP) is a geological repository for disposal of U.S. defense transuranic radioactive waste. Built and operated by the U.S. Department of Energy (DOE), it is located in the Permian age salt beds in southeastern New Mexico at a depth of 655 m. Performance assessment for the repository's compliance with the 10,000-year containment standards was completed in 1996 and the U.S. Environmental Protection Agency (EPA) certified in 1998 that the repository meets compliance with the EPA standards 40 CFR 191 and 40 CFR 194. The Environmental Evaluation Group (EEG) review of the DOE's application for certification identified a number of issues. These related to the scenarios, conceptual models, and values of the input parameters used in the calculations. It is expected that these issues will be addressed and resolved during the first 5-year recertification process that began with the first receipt of waste at WIPP on March 26, 1999, and scheduled to be completed in March 2004.
Keywords:WIPP  radioactive waste  repository  performance assessment  transuranic waste
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号