Abstract: | Previous research on material requirements planning (MRP) systems has rarely considered the impact of the master production scheduling method used to promise customer orders and to allocate production capacity. Based on a simulation study of an MRP environment, we show that the correct selection of a master production schedule (MPS) method depends on the variance of end-item demand. In addition, we find evidence that the effectiveness of a particular MPS method can be enhanced by holding buffer inventory at the same level in the product structure as in the MPS. |