首页 | 本学科首页   官方微博 | 高级检索  
     

低渗油藏CO2驱中注采方式优化设计
引用本文:杨文君,李德海. 低渗油藏CO2驱中注采方式优化设计[J]. 西南石油大学学报(社会科学版), 2009, 2(2): 101-107. DOI: 10.3863/j.issn.1674-5094.2009.02.023
作者姓名:杨文君  李德海
作者单位:1.中国石油大学石油工程教育部重点实验室,北京 昌平 102249; 2.美国德州大学奥斯汀分校石油地质系,Austin TX 78712
摘    要:低渗油藏储层致密,衰竭与注水效果差,由于CO2具有易流动、降黏、体积膨胀的特点,在解决低渗透油藏开发方面表现出独特的优势。讨论了低渗油藏CO2驱中的注采方式,分析了目前常用的连续注气、水气交替和生产井控制等注采方式的优缺点,提出应综合考虑原油采收率、CO2埋存量、经济效益及其在低渗油藏中的适用性。并针对以上方法的不足提出了另外3种改进注采方式,通过油藏工程研究、典型模型和实例油藏的数值模拟进行测试分析,表明改进的依据生产井气油比和平均静压两种指标实施开关井控制的CO2驱注采方法能够满足低渗油藏注气能力需要,且具有开发周期短、油藏采收率高、CO2埋存潜力大等特点,油田实施简易,能够取得较好经济、社

关 键 词:低渗, 2驱')"  >CO2驱, EOR, 埋存, 注采方式

On Reasons and Countermeasures of Employment Difficulty of College Graduates
YANG Wen-jun,LI De-hai. On Reasons and Countermeasures of Employment Difficulty of College Graduates[J]. Journal of Southwest Petroleum University(Social Sciences Edition), 2009, 2(2): 101-107. DOI: 10.3863/j.issn.1674-5094.2009.02.023
Authors:YANG Wen-jun  LI De-hai
Affiliation:1.MOE Key Laboratory of Petroleum Engineering,China University of Petroleum,Changping Beijing 102249,China;2.Department of Petroleum Geology,University of Texas,Austin,TX 78712,USA
Abstract:Due to the tight nature of low-permeability reservoir,recoveries from depletion,water flooding and normal EOR methods are greatly limited.However,gases like CO2 with lower viscosity have higher injectivity which can co-optimize oil recovery and CO2 sequestration.In this study,reservoir engineering analysis and simulations are performed to investigate the best injection and production schemes in tight reservoirs among continuous gas injection,water alternative gas injection and producer control according to GOR and average reservoir pressure,periodical injection and production,improved well control production method,etc.The three objective functions are oil recovery,amount of CO2 sequestered and net present value.Result shows that continuous CO2 injection by using directional injectors coupled producers′ well control method according to oil well static pressure and gas oil ratio is the best scheme during CO2 flooding in tight reservoirs,which can give higher oil recovery and the most CO2 sequestration with higher injectivity,shorter developing period
Keywords:tight reservoir   CO2 flooding   EOR   sequestration   injection-production schemes
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《西南石油大学学报(社会科学版)》浏览原始摘要信息
点击此处可从《西南石油大学学报(社会科学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号