首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Economic Lot Scheduling Problem with Returns
Authors:Ou Tang  Ruud Teunter
Abstract:Motivated by a case study of a company that produces car parts, we study the multi‐product economic lot scheduling problem for a hybrid production line with manufacturing of new products and remanufacturing of returned products. For this economic lot scheduling problem with returns (ELSPR), we consider policies with a common cycle time for all products, and with one manufacturing lot and one remanufacturing lot for each product during a cycle. For a given cycle time, the problem is formulated as a mixed integer linear programming (MIP) problem, which provides the basis for an exact solution. The application of this model for one of the core products of the case study company indicates a 16% reduction in cost compared to the current lot scheduling policy.
Keywords:ELSP  returns  remanufacturing  reverse logistics
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号