首页 | 本学科首页   官方微博 | 高级检索  
     


MRP in a job shop environment using a resource constrained project scheduling model
Affiliation:1. D.A.I., Politecnico di Torino, Italy;2. CNR, IEIIT, Torino, Italy;3. College of Business, Florida International University, USA;4. Université Francois-Rabelais, CNRS, LI EA 6300, OC ERL CNRS 6305, Tours, France;1. Department of Built Environment Engineering, Auckland University of Technology, Private Bag 92006, Auckland 1142, New Zealand;2. Department of Civil and Environmental Engineering, The University of Auckland, Private Bag 92019, Auckland 1142, New Zealand;3. Engineering School, Universidad Panamericana, Campus Guadalajara, Mexico;4. Pontificia Universidad Católica de Valparaíso, Chile
Abstract:One of the most difficult tasks in a job shop manufacturing environment is to balance schedule and capacity in an ongoing basis. MRP systems are commonly used for scheduling, although their inability to deal with capacity constraints adequately is a severe drawback. In this study, we show that material requirements planning can be done more effectively in a job shop environment using a resource constrained project scheduling model. The proposed model augments MRP models by incorporating capacity constraints and using variable lead time lengths. The efficacy of this approach is tested on MRP systems by comparing the inventory carrying costs and resource allocation of the solutions obtained by the proposed model to those obtained by using a traditional MRP model. In general, it is concluded that the proposed model provides improved schedules with considerable reductions in inventory carrying costs.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号