首页 | 本学科首页   官方微博 | 高级检索  
     


An integrated model for economic design of chi-square control chart and maintenance planning
Authors:Hasan Rasay  Yahia Zare Mehrjerdi
Affiliation:Industrial Engineering Department, Yazd University, Yazd, Iran
Abstract:Considered process in this article is a two-stage dependent process. Each item in this process has two quality characteristics as x and y while x and y are related to the stage 1 and 2, respectively. Each stage has two operational states as the in-control state and out-of-control state and transition time from the in-control state to the out-of-control state follows a general continues distribution function. The process is monitored using a chi-square control chart. An integrated model that coordinates the decisions related to the economic design of the used control chart and maintenance planning is presented. For the evaluation of the integrated model performance, a stand-alone maintenance model is also presented, and the performance of these two models is compared with each other.
Keywords:chi-square control chart  economic design  integrated model  maintenance planning.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号