首页 | 本学科首页   官方微博 | 高级检索  
     检索      


COMBINED PRODUCTION AND MAINTENANCE SCHEDULING FOR A MULTIPLE‐PRODUCT,SINGLE‐ MACHINE PRODUCTION SYSTEM
Authors:THOMAS W SLOAN  J GEORGE SHANTHIKUMAR
Abstract:Traditionally, the problems of equipment maintenance scheduling and production scheduling in a multi‐product environment have been treated independently. In this paper, we develop a Markov decision process model that simultaneously determines maintenance and production schedules for a multiple‐product, single‐machine production system, accounting for the fact that equipment condition can affect the yield of different product types differently. The problem was motivated by an application in semiconductor manufacturing. After examining structural properties of the optimal policy, we compare the combined method to an approach often used in practice. In the nearly 6,000 test problems studied, the reward from the combined method was an average of more than 25 percent greater than the reward from the traditional method.
Keywords:PRODUCTION SCHEDULING  EQUIPMENT MAINTENANCE  MARKOV DECISION PROCESSES  SEMICONDUCTOR MANUFACTURING
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号