首页 | 本学科首页   官方微博 | 高级检索  
     


A REVIEW OF FLOWSHOP SCHEDULING RESEARCH WITH SETUP TIMES
Authors:T. C. EDWIN CHENG  JATINDER N. D. GUPTA  GUOQING WANG
Abstract:Flowshop scheduling problems with setup times arise naturally in many practical situations. This paper provides a review of static and deterministic flowshop scheduling research involving machine setup times. The literature is classified into four broad categories, namely sequence independent job setup times, sequence dependent job setup times, sequence independent family setup times, and sequence dependent family setup times. Using the suggested classification scheme, this paper organizes the flowshop scheduling literature involving setup and/or removal times and summarizes the existing research for different flowshop problem types. This review reveals that, while a considerable body of literature on this subject has been created, there still exist several potential areas worthy of further research.
Keywords:PLANNING AND CONTROL  FLOWSHOP SCHEDULING  SETUP TIME INFLUENCE  PROBLEM COMPLEXITY AND CLASSIFICATION  REVIEW OF SOLUTION PROCEDURES
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号