A Methodology for Seismic Risk Analysis of Nuclear Power Plants
Authors:Stan Kaplan  Harold F. Perla  Dennis C. Bley
Affiliation:Pickard, Lowe and Garrick, Inc., Irvine, California 92714.
Abstract:This methodology begins by quantifying the fragility of all key components and structures in the plant. By means of the logic encoded in the plant event trees and fault trees, the component fragilities are combined to form fragilities for the occurrence of plant damage states or release categories. Combining these, in turn, with the seismicity curves yields the frequencies of those states or releases. Uncertainty is explicitly included at each step of the process.
Keywords:seismic    nuclear    methodology    dependency
正在获取引用信息,请稍候...
相似文献(共20条):
[1]、Chauncey Starr.Risk Criteria for Nuclear Power Plants: A Pragmatic Proposal1[J].Risk analysis,1981,1(2):113-120.
[2]、Mardyros Kazarians,Nathan O. Siu,George Apostolakis.Fire Risk Analysis for Nuclear Power Plants: Methodological Developments and Applications[J].Risk analysis,1985,5(1):33-51.
[3]、M. Elisabeth Paté-Cornell.PRA for Nuclear Power Plants[J].Risk analysis,1985,5(3):169-169.
[4]、Ralph L. Keeney,Detlof von,Winterfeldt.Managing Nuclear Waste from Power Plants[J].Risk analysis,1994,14(1):107-130.
[5]、Kenneth A. Solomon,Pamela F. Nelson,James R. Chiesa,Katy Wolf.An Evaluation of Alternative Safety Criteria for Nuclear Power Plants[J].Risk analysis,1985,5(3):209-216.
[6]、Mika Kivimäki,Raija Kalimo.Risk Perception Among Nuclear Power Plant Personnel: A Survey[J].Risk analysis,1993,13(4):421-424.
[7]、Stephen C. Hora,Ronald L. Iman.Bayesian Modeling of Initiating Event Frequencies at Nuclear Power Plants1[J].Risk analysis,1990,10(1):103-109.
[8]、Lennart Sjöberg,Britt-Marie Drottz-Sjöberg.Knowledge and Risk Perception Among Nuclear Power Plant Employees[J].Risk analysis,1991,11(4):607-618.
[9]、Marko &#;epin.The Risk Criteria for Assessment of Temporary Changes in a Nuclear Power Plant[J].Risk analysis,2007,27(4):991-998.
[10]、Mika Kivimäki,Raija Kalimo,Simo Salminen.Perceived Nuclear Risk, Organizational Commitment, and Appraisals of Management: A Study of Nuclear Power Plant Personnel[J].Risk analysis,1995,15(3):391-396.
[11]、Ronald L. Iman,Stephen C. Hora.Bayesian Methods for Modeling Recovery Times with an Application to the Loss of Off-Site Power at Nuclear Power Plants[J].Risk analysis,1989,9(1):25-36.
[12]、Raimo P. Hämäläinen,Mats R. K. Lindstedt,& Kari Sinkko.Multiattribute Risk Analysis in Nuclear Emergency Management[J].Risk analysis,2000,20(4):455-468.
[13]、Gramling,Robert,Forsyth,Craig J.,Wooddell,George.Expert Informants and Relative Risk: A Methodology for Modeling Waterways[J].Risk analysis,1998,18(5):557-562.
[14]、Ronald L. Iman,Jon C. Helton,Jay D. Johnson.A Methodology for Grouping Source Terms for Consequence Calculations in Probabilistic Risk Assessments[J].Risk analysis,1990,10(4):507-520.
[15]、William R. Gaffey.The Methodology of Risk Assessment[J].Risk analysis,1984,4(1):5-6.
[16]、魏其岩,田志龙.核电站非连续性需求条件下的业务外包风险研究[J].管理学报,2007,4(4):460-463.
[17]、Theodore S. Glickman.A Methodology for Estimating Time-of-Day Variations in the Size of a Population Exposed to Risk[J].Risk analysis,1986,6(3):317-324.
[18]、Ronald G. Whitfield,Thomas S. Wallsten.A Risk Assessment for Selected Lead-Induced Health Effects: An Example of a General Methodology[J].Risk analysis,1989,9(2):197-207.
[19]、Baruch Fischhoff,Paul Slovic,R. Talbot Page,Douglas Maclean.Nuclear Power: Time for Détente[J].Risk analysis,1984,4(3):153-153.
[20]、Thomas A. Daniels,K. S. Canady.A Nuclear Utility\'s Views on the Use of Probabilistic Risk Assessment[J].Risk analysis,1984,4(4):281-286.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号